SL-ZAKD 80 (128)A-1N w/o TRE-B-45-V-Z

Meter connection terminal

SL-ZAKD 80 (128)A-1N w/o TRE-B-45-V-Z

Article number 1006332
Smart meter connection clamp
Continuous current 80A
Overload current 2h 128A
Version 1N without tariff connection; pinned with 6-6-45-V

EAN 9120075473712

Additional information

Colour

White/red

Country

CH

Depth of installed product

35 mm

Height of installed product

71 mm

Nominal current

80A

Test overload current

128A/2h

Packaging unit

40 pcs.

Number of poles

3P+1N

Total power loss under nominal current

2,53 W

Weight of installed product

0,29 kg

Width of installed product

135 mm

Clamp cross-section

2,5-35 mm²

Technical features

Packaging unit: 40 pcs.
Nominal current: 80A
Test overload current: 128A/2h
Total power loss under nominal current: 2,53 W
Number of poles: 3P+1N
Height of installed product: 71 mm
Width of installed product: 135 mm
Depth of installed product: 35 mm
Weight of installed product: 0,29 kg
Clamp cross-section: 2,5-35 mm²
Colour: White/red
Country: CH

8 services our customers appreciate

UEW replacement
Bridging connectors must be checked annually

UEW replacement

The bridging tools protect engineers when changing meters. Tools should be checked once they have been plugged in approx. 1,000 times. You can do this by measuring the contact springs and performing a visual check yourself.
A worn bridging tool cannot be repaired. However, you can order a new bridging plug from us at list price, then return the used one to us to receive a credit of EUR 40.
If you have any questions, please contact our sales team directly at sales@seidlgroup.com.

Clamps with EAN code
Personalised components for identification purposes

Clamps with EAN code

Especially when it comes to fast data capture and data input, barcode labels are a means for saving time and money while also increasing productivity. Due to the many enquiries we receive from our customers, we have decided to also offer this service.
Drop us a short message with your requirements.

Pinning
It saves time – a pre-pinned meter connection clamp

Pinning

Using pre-assembled pins saves you time and slashes the probability of errors during commissioning to zero. Installation safety is also increased because we test the assembly of the pins here in our factory.

Sampling
Free of charge and on site

Sampling

Do you have an energy meter (smart meter) and want a suitable system for it? We check whether your meter is compatible with our system free of charge. On request, we can also have this tested by an accredited tester.

System configuration
Compatibility check of the various components

System configuration

The system requirements vary depending on the market and user. Send us an email to andreas.hollerer@seidlgroup.com with the following information: smart meter manufacturer, smart meter series, country and amperage

Accredited check
Sure to be recognised

Accredited check

The accreditation procedure includes a precise inspection, a thorough check and a responsible evaluation. We check your components using our system. Given the complexity, it is often recommended to consider having a check carried out by a third party, in order to ensure a high degree of confidence and to convey a feeling of safety.

Tool configuration
Installation kits for individual requirements

Tool configuration

To ensure smooth installation on the construction site or in the workshop, the right tools must always be to hand. We offer the right equipment for every application, with pre-defined tool sets or customised sets to precisely meet your requirements.
Send your enquiry, quoting the quantity of articles required, to sales@seidlgroup.com. We would be pleased to advise you and prepare an offer that precisely meets your needs.

Advice on occupational safety
Compact training courses online or on site

Advice on occupational safety

The basis for a safe meter exchange is appropriate practical knowledge, in order to meet the requirements of the correct and appropriate application. Let us know that you are interested in practical training. We will inform you automatically once the next date for a training course has been set.